Open house at The Ronald Reagan National Airport Terminal

PROJECT DESCRIPTION:  Secure National Hall
Construction of  two new Security Screening Check Points (SSCP’s) to facilitate the removal of the existing Security Screening Check Points located at each Concourse within the existing Airport.  The new Security Screening Check Points are additions to the existing Airport that will be constructed over the existing arrivals roadway.  The two check points are located immediately adjacent to the existing cross over bridges from the metro on the north and south sides of the terminal.  Each new SSCP (North and South) consists of new steel structure  on auger cast and micro pile foundations with roughly 50,000 square feet of finished space for passenger queuing lines and the new TSA screening stations.  The work entails full architectural fit out and finishes, MEP and Special Systems required for a complete and operational screening check point.  The Project also consist of extensive renovations and building modifications to the existing Terminal building to align with the new adjoining SSCP’s 



EVENT LOCATION:
United Way Worldwide • Mary E. Gates Learning Center
701 North Fairfax Street
Alexandria, VA 22314

DATE:
February 16, 2017

TIME:
3:00pm – 6:00pm

TO REGISTER:
Please register on eventbrite
www.eventbrite.com/e/dca-secure-national-hall-informational-open-house-tickets-31481966409

Banner 468 x 60 px